Other Equipment and Topics

Observations and Overview of the U.S. Market for Fuse Links, Power Fuses and Current Limiting Fuses Among Mid-sized Electric Utilities

This new 37 page market report is based on a survey of mid-size utilities regarding usage levels and brand preferences for fuse links, power fuses, and current limiting fuses. The report looks at the most common amp ratings, key manufacturers, budgets and annual usage levels of fuse links, power fuses and current limiting fuses among the sample, and offers projections to the entire U.S. market. The power fuse section also looks at indoor versus outdoor applications and refillable versus one time use units. Voltage and current combinations are charted by usage levels for current limiting fuses. The fuse products report is priced at $675.00.
$675.00

Or download an order form and return it to us via fax or email.

Download a sample of the report.

Automatic Generation Control: An Analysis of AGC Usage Patterns in U.S. Electric Power ISO/RTOs and Major Utilities 2012

This 16 page summary looks at how 41 electric utilities see the need for automatic generation control.

$295.00

The World Market for Supervisory Control and Data Acquisition Systems in Gas & Oil Pipeline Operations and Gas Distribution Utilities: 2005-2007

[call or fax to place order] Complete Three Volume Set $1000

[call or fax to place order] Volume 1 – Global Summary of Research Findings $500

[call or fax to place order] Volume 2 – Market Analysis/Forecast $500

[call or fax to place order] Volume 3 – SCADA Supplier Profiles $250

North American Market for SCADA Systems in Water and Wastewater Utilities: 2005-2007

[call or fax to place order] Complete Three Volume Set $900

[call or fax to place order] Volume 1 – North American Market $300

[call or fax to place order] Volume 2 – Market Analysis/Forecast $300

[call or fax to place order] Volume 3 – Supplier Profiles $200

Performance-Based Rates (PBR) for U.S. Electric Utilities: A First Quarter 2007 Status Report

One Volume $95

LONWORKS: General Usage Patterns and Market Perspectives for the Energy Industry

Published: May 2004

One Volume $95

The Mediterranean Ring Project: 2006 Status and Plans

One Volume $95

Description and Assessment of the Market for HV/MV Gas Insulated Switchgear Used by U.S. Electric Utilities: 2007

One Volume $95

Distributed Generation: A Utility Perspective – 2002 – 2004

Published: March 2002

[call or fax to place order] Complete Three Volume Set $500

[call or fax to place order] Volume 1 – North American Study $250

[call or fax to place order] Volume 2 – International Study $250

[call or fax to place order] Volume 3 – Profiles of Manufacturers of DG Equipment $100